Pricing Excavation Work with a 120-Class Excavator in Confined Commercial Spaces
#1
The Role of the 120-Class Excavator
The 120-class excavator, such as the John Deere 120, is a mid-sized hydraulic machine typically weighing around 26,000 to 30,000 lbs. It is widely used in utility trenching, foundation excavation, and general site development. With a digging depth of approximately 18 feet and a swing radius that balances reach with maneuverability, the 120 is often chosen for its versatility and transportability. John Deere introduced the 120 series in the late 1990s, and it has since become a staple in both owner-operator fleets and rental yards.
Challenging Conditions in Enclosed Construction Sites
Operating a 120-class excavator inside a partially completed commercial building presents a unique set of challenges. In one scenario, the machine was tasked with trenching for underground utilities in a structure where the steel trusses and walls were already in place. This created a confined environment with:
  • Overhead obstructions: No clearance above the boom, requiring precise control to avoid contact with trusses and columns.
  • Tight swing radius: Limited space to maneuver the boom and stick, especially when loading spoil into trucks.
  • Obstructed trenching path: Numerous pipe stubs protruding from the ground, creating a “minefield” that restricted bucket movement.
  • Difficult soil conditions: Muddy terrain that complicated trench box placement and machine stability.
These factors significantly reduce productivity and increase the risk of damage to the structure or equipment.
Evaluating Hourly Rates for Specialized Excavation
In standard open-field conditions, operating a 120-class excavator might command rates between $90 and $125 per hour, depending on region, fuel costs, and operator experience. However, in high-risk, low-clearance environments, rates can justifiably increase due to:
  • Increased liability: Any contact with structural elements could result in costly repairs or safety violations.
  • Reduced efficiency: The need to operate with the stick fully extended and the boom carefully maneuvered slows down production.
  • Specialized skill: Only experienced operators can safely and effectively work in such constrained conditions.
In one case, a rate of $156 per hour was charged for this type of work, reflecting the added complexity and risk. While some might argue that a smaller machine—such as a mini excavator in the 8,000–18,000 lb range—could have performed the task more efficiently, the choice of a 120-class machine may have been driven by reach requirements or lifting capacity.
Alternative Equipment Considerations
Several operators noted that a mini excavator or a backhoe loader (e.g., John Deere 410J or CAT 420) might have been better suited for indoor excavation. These machines offer:
  • Smaller footprint: Easier to maneuver in tight spaces.
  • Lower boom height: Reduced risk of overhead collisions.
  • Hydraulic versatility: Capable of trenching, lifting, and loading with less clearance.
Pairing a mini excavator with a compact loader or skid steer for spoil removal could further improve efficiency and safety.
Recommendations for Future Projects
  • Conduct pre-construction excavation before erecting structural elements when possible.
  • Use 3D modeling or BIM to simulate equipment movement in confined spaces.
  • Rent appropriately sized equipment for indoor work, even if it requires short-term rental costs.
  • Charge premium rates for high-risk, low-clearance excavation to reflect the added skill and liability.
Conclusion
Pricing excavation work with a 120-class excavator in a confined commercial building must account for more than just machine hours. The complexity of the environment, the risk of structural damage, and the reduced productivity all justify a higher hourly rate. While alternative equipment may offer better maneuverability, the final decision should balance reach, lifting needs, and operator expertise. In such scenarios, thoughtful planning and transparent pricing are essential to ensure safety, efficiency, and profitability.
Reply


Possibly Related Threads…
Thread Author Replies Views Last Post
  Which Mini Excavator Offers the Best Value Today MikePhua 0 7 29 minutes ago
Last Post: MikePhua
  How Did the Old Cable Shovels Actually Work MikePhua 0 4 55 minutes ago
Last Post: MikePhua
  Choosing the Right Mini Excavator: Key Considerations MikePhua 0 10 2 hours ago
Last Post: MikePhua
  Evaluating the Hitachi EX50U Hydraulic Excavator for Resale MikePhua 0 13 3 hours ago
Last Post: MikePhua
  Mustang 170Z Mini Excavator with Hydraulic Breaker: Performance, Maintenance, and Best Practices MikePhua 0 12 3 hours ago
Last Post: MikePhua
  Battery Wiring and Cold Start Configuration on the CAT 325BL Excavator MikePhua 0 12 4 hours ago
Last Post: MikePhua
  Choosing the Right 5-Ton Mini Excavator MikePhua 0 15 4 hours ago
Last Post: MikePhua
  Mitsubishi MX-35 Excavator: A Compact Yet Powerful Machine for Demanding Tasks MikePhua 0 12 4 hours ago
Last Post: MikePhua
  John Deere 510 Backhoe: A Reliable Workhorse in Construction and Excavation MikePhua 0 11 4 hours ago
Last Post: MikePhua
  Changing the Control Pattern on a 2000 JCB JS200L Excavator MikePhua 0 11 7 hours ago
Last Post: MikePhua
  Big Kobelco Excavator on the VT Campus: A Powerful Sight in Action MikePhua 0 11 7 hours ago
Last Post: MikePhua
  Komatsu D41P-6: A Reliable Machine for Construction and Excavation MikePhua 0 11 7 hours ago
Last Post: MikePhua
  Operating Larger Equipment in Tight Urban Spaces MikePhua 0 14 7 hours ago
Last Post: MikePhua
  Legacy Machines in Motion D8 D6 and DW21 at Work MikePhua 0 9 Today, 01:33 AM
Last Post: MikePhua
  Manitou MHT 790 Telehandler Built for Heavy Lifting in Tight Spaces MikePhua 0 11 Today, 01:24 AM
Last Post: MikePhua

Forum Jump:


Users browsing this thread: 1 Guest(s)