Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Rebuilding the Case 580K 4-390 Diesel Engine
#1
The Case 580K and Its Engine Legacy
The Case 580K backhoe loader, introduced in the mid-1980s, became one of the most widely used utility machines in North America. Known for its reliability and versatility, the 580K was powered by the 4-390 diesel engine—a naturally aspirated four-cylinder inline engine developed by Case Corporation. With a displacement of 3.9 liters and a power output around 67 horsepower, the 4-390 was designed for durability in construction, agriculture, and municipal work.
Case Corporation, founded in 1842, had already built a reputation for rugged farm and industrial equipment. By the time the 580K was released, Case had sold hundreds of thousands of backhoes globally. The 4-390 engine was a key part of that success, offering a balance of torque, fuel efficiency, and mechanical simplicity.
Disassembly and Initial Inspection
Rebuilding the 4-390 begins with a full teardown. Key components include:
  • Cylinder head and valves
  • Pistons, rings, and connecting rods
  • Crankshaft and main bearings
  • Camshaft and lifters
  • Fuel injection pump and injectors
  • Oil pump and timing gears
Before disassembly, drain all fluids and remove the engine from the chassis. Label wiring and hoses for reinstallation. Once the engine is on a stand, inspect for:
  • Cylinder wall scoring
  • Cracked or warped head
  • Worn cam lobes
  • Excessive bearing clearance
  • Piston ring wear or carbon buildup
In one rebuild, a contractor discovered that the number three cylinder had low compression due to a broken ring and scored liner. The damage was traced to prolonged overheating and poor oil maintenance.
Machining and Component Replacement
After inspection, send the block and head to a machine shop for:
  • Cylinder honing or boring
  • Head resurfacing and valve seat grinding
  • Crankshaft polishing or grinding
  • Pressure testing for cracks
Common replacement parts include:
  • Pistons and rings (standard or oversize)
  • Main and rod bearings
  • Gasket set
  • Oil pump
  • Timing gear set
  • Water pump
  • Injector nozzles
Always measure clearances and follow torque specs. Use assembly lube on bearings and cam lobes. Replace all freeze plugs and inspect oil galleries for debris.
Fuel System and Timing Considerations
The 4-390 uses a rotary injection pump, typically a CAV or Stanadyne unit. Rebuilding the pump requires specialized tools and calibration. If outsourcing, ensure the shop tests for:
  • Proper advance curve
  • Governor response
  • Leak-free operation under pressure
Injectors should be pop-tested and cleaned. Replace copper washers and torque to spec. Timing the pump involves aligning the timing marks on the gear train and setting the pump to top dead center on cylinder one.
In one rebuild, incorrect pump timing caused hard starts and white smoke. Resetting the pump to factory spec resolved the issue and restored full power.
Cooling and Lubrication Systems
Flush the radiator and replace all hoses. Install a new thermostat and inspect the water pump impeller. Pressure test the cooling system after assembly.
For lubrication:
  • Prime the oil pump before startup
  • Fill with high-zinc diesel-rated oil (15W-40)
  • Replace the oil filter and pre-fill with clean oil
  • Use a mechanical gauge to verify pressure on first start
A rebuild in Minnesota failed due to a dry start—no oil pressure for 20 seconds caused bearing damage. Always prime the system and verify flow before ignition.
Break-In Procedure and Final Adjustments
After assembly:
  • Crank the engine without fuel to build oil pressure
  • Start and idle for 10 minutes
  • Check for leaks and monitor temperature
  • Vary RPM under light load for the first 10 hours
  • Change oil and filter after 25 hours
Adjust valve lash to factory spec (typically 0.014–0.018 inches cold). Recheck after break-in. Monitor exhaust color, fuel consumption, and coolant level.
Terminology Notes
  • Cylinder Honing: A machining process that restores surface finish and oil retention in cylinder walls.
  • Pop Testing: A method of checking injector spray pattern and opening pressure.
  • Top Dead Center (TDC): The highest point of piston travel, used for timing reference.
  • Valve Lash: The clearance between the valve stem and rocker arm.
  • Freeze Plug: A metal disc that seals casting holes in the engine block.
Final Thoughts
Rebuilding the Case 4-390 engine is a rewarding process that restores life to a workhorse machine. With careful inspection, quality parts, and precise assembly, the engine can deliver thousands of hours of reliable service. Whether digging trenches, loading gravel, or clearing snow, a properly rebuilt 580K will keep working long after newer machines have retired. In the world of diesel iron, craftsmanship and attention to detail still matter.
Reply


Possibly Related Threads…
Thread Author Replies Views Last Post
  Troubleshooting Wisconsin VG4D Engine Won't Start MikePhua 0 1 47 minutes ago
Last Post: MikePhua
  CAT 226 Perkins Valve Adjustment Sequence and Engine Service Strategy MikePhua 0 1 51 minutes ago
Last Post: MikePhua
  Case 480 Shuttle Shift Problems and Transmission Recovery Strategy MikePhua 0 1 52 minutes ago
Last Post: MikePhua
  CAT 744J Engine Hotspot Issue MikePhua 0 1 54 minutes ago
Last Post: MikePhua
  Case 580E Kingpin Wear and Front Axle Rebuild Strategy MikePhua 0 1 1 hour ago
Last Post: MikePhua
  Case 580CK Fuel Starvation and Priming Failure Diagnosis MikePhua 0 1 1 hour ago
Last Post: MikePhua
  Blown Diesel Engines in Heavy Equipment and Practical Recovery Paths MikePhua 0 1 1 hour ago
Last Post: MikePhua
  New Holland LX885 Engine Troubleshooting and Solutions MikePhua 0 1 1 hour ago
Last Post: MikePhua
  Case 450B Dozer Hydraulic Leak Diagnosis and Field Repair Strategy MikePhua 0 1 1 hour ago
Last Post: MikePhua
  Troubleshooting and Repairing the Front End of the Case 580K Loader MikePhua 0 1 1 hour ago
Last Post: MikePhua
  Case 580E Hydraulic Function Limitation and Flow Diagnosis MikePhua 0 1 1 hour ago
Last Post: MikePhua
  Addressing Steering Issues in the Case 580CK Loader MikePhua 0 1 1 hour ago
Last Post: MikePhua
  Case CX210D PWM Control Issues and Diagnostic Strategies MikePhua 0 1 1 hour ago
Last Post: MikePhua
  Case 580B Hi-Lo Shifter Stuck and What to Do About It MikePhua 0 1 1 hour ago
Last Post: MikePhua
  Case 580B Power Steering Cylinder Disassembly and Repair Insights MikePhua 0 3 1 hour ago
Last Post: MikePhua

Forum Jump:


Users browsing this thread: 1 Guest(s)