Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
1970 Case Construction King Break Replacement
#1
The 1970 Case Construction King represents a pivotal era in the evolution of mid‑20th century construction equipment. Produced by Case Corporation, which was founded in 1842 and originally specialized in steam engines and agricultural equipment, the Construction King line was designed to compete directly with Caterpillar, John Deere, and other industrial leaders in the dozer and grader segment. The 1970 model introduced a robust frame, reliable hydraulics, and versatile attachments, making it suitable for heavy grading, earthmoving, and site preparation.
Machine Role and Market Position
The Construction King was marketed as a high‑capacity dozer and grader hybrid, capable of handling heavy-duty construction and farm site tasks. Its combination of traction, blade capacity, and mechanical simplicity allowed it to perform efficiently on rough terrain, including rocky cuts, roadbeds, and excavation sites. At the time, Case sold thousands of units globally, emphasizing durability, ease of maintenance, and compatibility with aftermarket attachments.
Engine and Powertrain
The 1970 Construction King models typically used Case 4‑ or 6‑cylinder diesel engines, naturally aspirated, producing approximately 110–140 hp (82–104 kW) depending on the exact configuration. Torque output ranged from 250–350 lb‑ft (340–475 Nm), optimized for pushing earth and operating hydraulic systems simultaneously. Engines were known for their mechanical fuel injection, making them robust but requiring careful maintenance to prevent wear and fuel delivery issues.
The powertrain included a manual transmission with torque converter options in some models, offering multiple forward and reverse speeds. Track‑type undercarriages provided excellent traction, while planetary final drives reduced stress on internal components, extending the service life of drivetrain parts.
Break Replacement and Common Issues
Break replacement in the 1970 Case Construction King is a critical maintenance task, often required due to wear over decades of operation. The break assembly typically includes:
• Hydraulic brake cylinders
• Brake pads or shoes
• Mounting pins and bushings
• Return springs
• Hydraulic lines and fittings
Over time, metal fatigue, hydraulic seal degradation, and accumulated debris in brake assemblies can lead to reduced stopping efficiency or uneven braking on one track. Users often encounter soft pedal response, fluid leakage, or noise from worn components.
Replacement Process
  1. Safety and Preparation
    • Chock tracks and disengage engine
    • Drain hydraulic fluid and depressurize lines
    • Remove access panels and guards
  2. Disassembly
    • Disconnect hydraulic lines carefully to prevent contamination
    • Remove mounting pins and extract brake shoes or pads
    • Inspect brake cylinder bores for scoring or corrosion
  3. Inspection and Cleaning
    • Check all bushings and pins; replace if wear exceeds tolerances
    • Clean accumulated dirt and sludge from hydraulic passages
    • Examine hydraulic hoses for cracks or brittleness
  4. Installation
    • Install new brake shoes or pads with proper lubrication
    • Reinstall hydraulic cylinders, ensuring seals are properly seated
    • Reconnect hydraulic lines and fill system with recommended fluid
  5. Testing
    • Run engine at idle and cycle brakes to check for leaks
    • Gradually apply braking load and verify proper stopping distance
    • Adjust tension or clearance as needed
Maintenance and Tips
Regular inspection and replacement of worn brake components extend machine life and ensure safety on the job site. Recommended tips include:
• Check hydraulic fluid levels weekly
• Inspect break pads for even wear every 250 operating hours
• Clean dust and debris from undercarriage to prevent accelerated wear
• Use Case‑approved replacement parts to maintain OEM performance
Practical Insights and Stories
Operators often share stories of maintaining these machines on long-term projects, noting that many 1970 Construction Kings remain functional today due to mechanical simplicity. One anecdote recounts a contractor using a restored unit for grading rural roads, where the original break system, after a complete overhaul, performed reliably across several months of continuous work. The durability of these machines has made them sought-after by restoration enthusiasts and small contractors seeking dependable vintage equipment.
Legacy and Market Value
Today, the 1970 Case Construction King holds value as a classic workhorse. Restored units may fetch $15,000–$25,000 USD depending on condition, while non-operational machines are often used for parts. Its legacy reflects the era of mechanical reliability over electronic complexity, offering operators a machine that is both serviceable and historically significant.
Conclusion
The 1970 Case Construction King exemplifies robust mid-century engineering, combining durable diesel power, reliable hydraulics, and track-based traction. Proper brake maintenance, especially replacing worn components, is essential for safety and performance. Its continued presence on construction sites and in collectors’ hands underscores its role as a mechanical icon in the evolution of earthmoving equipment.
Reply


Possibly Related Threads…
Thread Author Replies Views Last Post
  Case 1840 Dies When Lights Are On MikePhua 0 15 Yesterday, 06:28 PM
Last Post: MikePhua
  CASE 580 Rear Seal Installation MikePhua 0 11 Yesterday, 05:50 PM
Last Post: MikePhua
  JD 310B Hood and Radiator Pad Replacement MikePhua 0 35 12-31-2025, 07:19 PM
Last Post: MikePhua
  Case 480D Shuttle Transmission Trouble MikePhua 0 70 12-30-2025, 08:37 PM
Last Post: MikePhua
  Cat D5C Hystat Track Adjuster Seal Replacement MikePhua 0 67 12-30-2025, 08:37 PM
Last Post: MikePhua
  Case 580SE 4x4 Transfer Case Service MikePhua 0 86 12-29-2025, 03:26 PM
Last Post: MikePhua
  Case 580F Weld‑On Front Axle Repair MikePhua 0 87 12-29-2025, 03:05 PM
Last Post: MikePhua
  Case 580C Brake Repair MikePhua 0 84 12-29-2025, 03:04 PM
Last Post: MikePhua
  1967 Case 580CK Will Not Go Into Forward Reliably Grinding MikePhua 0 90 12-29-2025, 02:56 PM
Last Post: MikePhua
  Case TR320 Auxiliary Hydraulic Failure MikePhua 0 93 12-27-2025, 07:06 PM
Last Post: MikePhua
  Case 130B Electrical Faults MikePhua 0 93 12-27-2025, 07:06 PM
Last Post: MikePhua
  New Holland 4.75 Injector Replacement MikePhua 0 85 12-27-2025, 07:05 PM
Last Post: MikePhua
  2016 CASE 750M STARTING ISSUE POWER FROM KEY TO CPU BUT NOT BACK TO STARTER SOLENOID MikePhua 0 76 12-25-2025, 08:48 AM
Last Post: MikePhua
  Case 1816 Drive Motor and Sprocket Replacement MikePhua 0 78 12-25-2025, 08:46 AM
Last Post: MikePhua
  Fuel Lift Pump Replacement MikePhua 0 75 12-25-2025, 08:37 AM
Last Post: MikePhua

Forum Jump:


Users browsing this thread: