Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Replacing Track Chains on the Case 550 Long Track Dozer
#1
The Case 550 and Its Long Track Configuration
The Case 550 crawler dozer was introduced in the late 1980s as part of Case Corporation’s compact dozer lineup. Designed for grading, site prep, and light clearing, the 550 featured a hydrostatic transmission, a 4-cylinder diesel engine producing around 60 horsepower, and a robust undercarriage suited for varied terrain. The long track (LT) variant extended the track frame and added more chain links and pads, improving stability and flotation on soft ground.
Case, founded in 1842 and later merged into CNH Industrial, has produced thousands of 550-series dozers. While the standard track version is more common, the long track configuration is favored in forestry, wetland, and slope applications where ground pressure must be minimized.
Identifying the Correct Chain Length and Pitch
Owners of the 550 LT often face challenges when sourcing replacement track chains. Dealers may struggle to locate the correct part number, especially for older models not listed in modern inventory systems. However, the chain specifications can be determined by measuring:
  • Sprocket pitch diameter
  • Chain pitch (typically 6 inches for this class)
  • Number of pads (commonly 39 for the LT variant)
  • Bolt spacing and pad width
Track chains are composed of links joined by pins and bushings, with bolt-on pads attached to each link. The total length is a function of link count and pitch. For the 550 LT, the chain is longer than the standard 550, requiring additional links and pads.
Dealer Pricing and Availability Constraints
In one case, a Canadian owner received a quote of $3,800 CAD for a set of chains, excluding bolts and nuts. The price reflected limited availability—only one set remained in stock in Texas. While the cost may seem high, it aligns with current market conditions for OEM-grade chains in low-volume production.
Factors influencing price include:
  • Rarity of the long track variant
  • Supply chain disruptions
  • Currency exchange rates
  • Shipping and import duties
Aftermarket suppliers such as Trek, ITM, and ITR may offer compatible chains at lower prices, but quality and fitment should be verified. For smaller machines like the 550, extreme-duty chains are not always necessary, but proper metallurgy and bushing hardness remain critical.
Sprockets, Rollers, and Track Press Considerations
Replacing chains without addressing other undercarriage components can lead to premature wear. Ideally, new chains should be paired with:
  • Fresh sprockets (already replaced in this case)
  • Inspected or replaced bottom rollers
  • Carrier rollers and idlers checked for wear
  • Proper torqueing of pad bolts using a track press
A track press is a hydraulic tool used to disassemble and reassemble track chains, ensuring correct pin installation and pad bolt torque. Many independent shops and aftermarket dealers offer pressing services, which are recommended for safety and longevity.
Anecdote from Quebec
An operator in Val-des-Monts, Quebec acquired a 1990 Case 550 LT and began sourcing chains after discovering the dealer couldn’t locate the model in their system. After persistent inquiry, the dealer found the correct chains and quoted the final price. The owner, retired and enjoying his “sandbox,” was eager to get the machine operational and begin learning grading techniques. With a Cat 215 shovel already in use, the dozer would complement site work and expand capabilities.
Aftermarket Options and Sourcing Strategy
To locate compatible chains:
  • Measure pitch and pad count directly
  • Contact multiple dealers and independent suppliers
  • Ask for SALT (sealed and lubricated track) options if available
  • Compare prices across OEM and aftermarket brands
  • Confirm availability of pressing services
SALT chains offer extended life by sealing lubricant inside the bushings, reducing wear and maintenance. For light-duty machines, SALT may be optional, but worth considering if long-term use is planned.
Conclusion
Replacing track chains on a Case 550 long track dozer requires persistence, accurate measurement, and strategic sourcing. While dealer systems may not always list older variants, the physical specs of the chain provide a reliable path to identification. With new sprockets already installed and rollers under inspection, the machine is well-positioned for a full undercarriage refresh. Whether sourced from OEM or aftermarket, proper installation and torqueing are essential to ensure performance and safety. For operators reviving legacy equipment, every link counts—and every hour on the machine is earned through preparation.
Reply


Possibly Related Threads…
Thread Author Replies Views Last Post
  Case 530CK Clutch Slipping Problems and What You Should Know MikePhua 0 39 12-08-2025, 09:17 AM
Last Post: MikePhua
  Oddball Question on Track Loader Undercarriages MikePhua 0 43 12-08-2025, 09:15 AM
Last Post: MikePhua
  Case 580C Starting Problems MikePhua 0 39 12-08-2025, 09:13 AM
Last Post: MikePhua
  Case 580C Starter Circuit Short MikePhua 0 37 12-08-2025, 09:12 AM
Last Post: MikePhua
  Troubles with Fuel on a Track Loader MikePhua 0 36 12-08-2025, 09:08 AM
Last Post: MikePhua
  Case 1450B No Steering MikePhua 0 67 12-02-2025, 02:36 PM
Last Post: MikePhua
  Replacing An Instrument Panel On Heavy Equipment MikePhua 0 74 11-28-2025, 02:17 PM
Last Post: MikePhua
  Replacing the TCU in a Terex TA35 Dump Truck Requires Careful Sourcing and Programmin MikePhua 0 82 11-19-2025, 05:41 PM
Last Post: MikePhua
  Morgan Syncro Track SX-70 Wiring Overview MikePhua 0 88 11-19-2025, 05:04 PM
Last Post: MikePhua
  Case W4 Range Selector Operation and Troubleshooting MikePhua 0 84 11-19-2025, 05:02 PM
Last Post: MikePhua
  Case 580ST Loader Drops When Backhoe Hydraulics Are Engaged Due to Ride Control Activation MikePhua 0 80 11-19-2025, 04:19 PM
Last Post: MikePhua
  Case 580SL Fuel Starvation at High RPM MikePhua 0 90 11-19-2025, 04:01 PM
Last Post: MikePhua
  John Deere 550 Dozer Left Steering Brake Problem MikePhua 0 85 11-19-2025, 04:00 PM
Last Post: MikePhua
  Track Frame Misalignment on John Deere 850C Dozer Often Caused by Dry or Worn Pivot Shaft Bushings MikePhua 0 80 11-19-2025, 03:57 PM
Last Post: MikePhua
  Replacing Boom Cables on the Gradall 524 Telehandler Requires Precision and Awareness of Cable Routing Challenges MikePhua 0 87 11-19-2025, 03:47 PM
Last Post: MikePhua

Forum Jump:


Users browsing this thread: 1 Guest(s)