Planning to Move 4,000 Yards of Dirt Over 1,000 Feet
#1
Project Overview
A user asked for advice on how long it would take to move approximately 4,000 cubic yards of dirt over a distance of 1,000 feet. The goal was to estimate time and resources for this earthmoving project.
Equipment Considerations
Members discussed the best equipment for the job, with suggestions ranging from using articulated dump trucks and excavators to scrapers and dozers, depending on site conditions and budget. They emphasized matching the hauling equipment’s capacity to the distance and type of soil.
Production Rate Estimates
Several users provided rough estimates of how much material could be moved per hour with different machines. Factors like cycle time, load size, travel speed, and operator skill were highlighted as major variables that could affect productivity.
Site Conditions
The conversation noted that ground conditions, weather, and possible obstacles could greatly influence efficiency. Uphill or soft ground would slow down hauling, while a well-prepared haul road could speed up the cycles.
Practical Tips
Advice included ensuring a clear, wide haul path, keeping equipment in good working condition, and possibly using multiple machines simultaneously to maintain continuous loading and dumping. Some suggested doing a small test section to verify real-world production rates.
Conclusion
Estimating the time to move 4,000 yards of dirt over 1,000 feet depends heavily on the chosen equipment, operator efficiency, and site conditions. Proper planning, reliable machines, and good haul road preparation are key to completing the project on time and within budget.
Reply


Possibly Related Threads…
Thread Author Replies Views Last Post
  All I Wanna Do Is Load Dirt MikePhua 0 12 08-26-2025, 09:14 PM
Last Post: MikePhua
  Track Loader or Dozer for Dirt Work and Motocross Construction MikePhua 0 12 08-26-2025, 06:57 PM
Last Post: MikePhua
  Oversized Trailers Are Clogging America’s Yards MikePhua 0 9 08-26-2025, 05:53 PM
Last Post: MikePhua
  Why Won’t My Case Super L Move Forward MikePhua 0 13 08-26-2025, 05:52 PM
Last Post: MikePhua
  Choosing the Right Dozer for Moving 10,000 Cubic Yards MikePhua 0 17 08-24-2025, 10:16 PM
Last Post: MikePhua
  Takeuchi TL250 vs John Deere 333D for Dirt Pushing MikePhua 0 13 08-24-2025, 08:21 PM
Last Post: MikePhua
  How Much Material Can a Mini Excavator Move MikePhua 0 14 08-24-2025, 08:17 PM
Last Post: MikePhua
  Caterpillar 5110 In The Dirt MikePhua 0 15 08-23-2025, 05:54 PM
Last Post: MikePhua
  Efficient Dirt Moving: Best Practices and Equipment Selection MikePhua 0 19 08-22-2025, 06:38 PM
Last Post: MikePhua
  AC 145T: A Robust Tool for Moving Dirt in Construction MikePhua 0 30 08-19-2025, 12:02 PM
Last Post: MikePhua
  Optimizing the Use of the Ingersoll Rand DX-700E Walk-Behind Roller for Dirt and Gravel Compaction MikePhua 0 28 08-14-2025, 10:07 PM
Last Post: MikePhua
  Reviving the Past: The Resurgence of Antique Truck Salvage Yards After 25 Years MikePhua 0 30 08-13-2025, 07:07 PM
Last Post: MikePhua
  Calculating Crane Swing Time and Speed: Practical Strategies for Heavy Lift Planning MikePhua 0 29 08-12-2025, 05:42 PM
Last Post: MikePhua
  Retrofitting a Hydraulic Thumb: Planning, Plumbing, and Practical Wisdom MikePhua 0 34 08-10-2025, 08:09 PM
Last Post: MikePhua
  The Fastest Methods to Move 300 Yards of Sand Over 200 Feet: An In-Depth Analysis MikePhua 0 21 08-08-2025, 08:49 PM
Last Post: MikePhua

Forum Jump:


Users browsing this thread: