Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Is Sonic Tracing Practical for Curb Preparation Work
#1
Quick answer
Sonic tracers can automate grade control under string lines for curb preparation, reducing labor and improving consistency. However, their effectiveness depends heavily on string material, peg spacing, and machine integration. In many regions, manual checking with levels and tape remains dominant due to cost and simplicity.
Sonic tracer technology and grading systems
A sonic tracer is a non-contact sensor that reads the position of a reference line—typically a string—and adjusts the grading blade accordingly. It’s often integrated into systems like Topcon System 5 or similar machine control platforms. These systems use:
  • Sonic sensors mounted on the moldboard or mast
  • Controllers that interpret string position and adjust blade height
  • Manual override switches for peg interference
  • Optional wire-traced string lines for improved signal clarity
The goal is to trim subgrade material precisely under the string line without constant manual measurement.
String line material and sensor compatibility
The success of sonic tracing depends on the physical properties of the string:
  • Thick bailing twine or wire-traced string: Offers better reflectivity and signal consistency
  • Fishing line or thin nylon: Difficult for sensors to detect, especially in bright sunlight or dusty conditions
Operators report that some curb crews use fishing line directly tied to pegs, which complicates sonic detection. Pegs themselves can interfere with readings, causing the blade to lift unnecessarily unless the system is manually overridden.
Field experience and practical adaptations
One grader operator in Queensland used a Topcon-equipped CAT 12H with a sonic tracer. He found that switching off auto mode near pegs was essential to prevent erratic blade movement. He also noted that using wire-traced string improved sensor reliability.
Another operator in Canada preferred manual checking. He placed material according to stakes, compacted it, then had a laborer walk behind the blade with a level and tape, checking every 5–6 feet. Adjustments were made on the fly, and the crew completed 900 meters of curb prep in under three hours.
Labor cost and regional variation
In Australia, employing a skilled grade checker can cost $60–$70 AUD per hour when factoring in wages, superannuation, insurance, and payroll tax. This drives interest in automation. In contrast, Canadian labor rates for similar roles may be as low as $11–$20 CAD per hour, making manual methods more viable.
Recommended practices for sonic tracer use
  • Use wire-traced string lines for consistent detection
  • Train operators to override auto mode near pegs
  • Maintain clean sensor surfaces and calibrate regularly
  • Combine sonic tracing with visual checks for critical grades
  • Consider hybrid setups with whisker sensors or mechanical feelers
Some operators mount a whisker or string holder directly to the moldboard, allowing a single person to trim accurately without relying on full automation.
Conclusion
Sonic tracers offer a promising way to reduce labor and improve grading precision under string lines, especially in high-cost labor markets. Their success depends on string material, peg layout, and operator skill. While not universally adopted, they represent a step toward smarter curb preparation—particularly when paired with robust machine control systems and thoughtful field adaptation.
Reply


Possibly Related Threads…
Thread Author Replies Views Last Post
  Mixing Wood Mulch with Sand: Practical Insights and Applications MikePhua 0 18 10-14-2025, 01:06 AM
Last Post: MikePhua
  Restarting Earthmoving Work After a Harsh Winter MikePhua 0 42 09-28-2025, 06:50 PM
Last Post: MikePhua
  Pipelaying and Utility Work in the Real World MikePhua 0 46 09-25-2025, 12:32 AM
Last Post: MikePhua
  Spreading Clay with a Clam Dump Truck in Site Preparation MikePhua 0 64 09-23-2025, 05:38 PM
Last Post: MikePhua
  Finishing Work in Construction Projects: Techniques and Challenges MikePhua 0 44 09-20-2025, 06:55 PM
Last Post: MikePhua
  Tricks of the Trade in Excavation and Pipe Work Practical Innovations from the Field MikePhua 0 52 09-20-2025, 12:12 PM
Last Post: MikePhua
  Beach Work: Challenges and Solutions for Heavy Equipment MikePhua 0 72 09-19-2025, 11:59 PM
Last Post: MikePhua
  Pricing and Practical Considerations in HDPE Pipe Laying Projects MikePhua 0 88 09-15-2025, 09:25 PM
Last Post: MikePhua
  Reviving the 40-Ton American Crane for Marine Demolition and Foundation Work MikePhua 0 82 09-13-2025, 08:01 PM
Last Post: MikePhua
  Partial Demolition in Construction and Demo Work MikePhua 0 82 09-11-2025, 03:16 PM
Last Post: MikePhua
  Land Clearing and Soil Preparation Strategies in Far North Queensland MikePhua 0 45 09-10-2025, 02:59 PM
Last Post: MikePhua
  Site Preparation for Construction and Equipment Access MikePhua 0 50 09-02-2025, 03:16 AM
Last Post: MikePhua
  Bridge Work MikePhua 0 93 08-29-2025, 10:33 PM
Last Post: MikePhua
  Boots on the Ground: The Realities of Construction Work MikePhua 0 58 08-25-2025, 05:07 PM
Last Post: MikePhua
  Converting an OTR Tractor to a Dump Truck for Dirt Work MikePhua 0 58 08-25-2025, 01:41 AM
Last Post: MikePhua

Forum Jump:


Users browsing this thread: 1 Guest(s)