Cable derailment on National 1300 series crane booms—especially the 13105A model—is often caused by uneven tension, misalignment, or wear pad failure. Without proper calibration and synchronized extension, proportioning cables can jump sheaves and suffer repeated damage.
National Crane 1300 Series Background and Boom Design
National Crane, a division of Manitowoc, has produced hydraulic truck-mounted cranes since the 1960s. The 1300 series, including the 13105A model, was introduced to serve mid-range lifting needs with telescoping booms and mechanical simplicity. These cranes feature multi-section booms with internal proportioning cables that synchronize extension and retraction of nested boom sections.
The proportioning system uses two cables routed over sheaves atop the center boom section. These cables anchor at the base of the main boom and connect to the lower portion of the extending section. Their function is to ensure that boom sections extend evenly, maintaining structural integrity and preventing binding.
Common Failure Symptoms and Root Causes
In Illinois, a mechanic working for a National dealer noted that sudden boom elevation or swing movements at full extension often dislodge wear pads, especially when bushings are dry. He recommended a full teardown and inspection rather than repeated cable replacement. His advice: “If the boom’s crooked, the cable’s doomed.”
Tooling and Calibration Notes
Proportioning cable failures on National 1300 series cranes stem from a combination of mechanical wear, tension imbalance, and boom misalignment. Addressing the issue requires more than cable replacement—it demands a holistic inspection of wear pads, sheaves, and extension synchronization. With careful calibration and preventive maintenance, operators can restore reliable boom function and avoid costly downtime.
Cable derailment on National 1300 series crane booms—especially the 13105A model—is often caused by uneven tension, misalignment, or wear pad failure. Without proper calibration and synchronized extension, proportioning cables can jump sheaves and suffer repeated damage.
National Crane 1300 Series Background and Boom Design
National Crane, a division of Manitowoc, has produced hydraulic truck-mounted cranes since the 1960s. The 1300 series, including the 13105A model, was introduced to serve mid-range lifting needs with telescoping booms and mechanical simplicity. These cranes feature multi-section booms with internal proportioning cables that synchronize extension and retraction of nested boom sections.
The proportioning system uses two cables routed over sheaves atop the center boom section. These cables anchor at the base of the main boom and connect to the lower portion of the extending section. Their function is to ensure that boom sections extend evenly, maintaining structural integrity and preventing binding.
Common Failure Symptoms and Root Causes
- Cable Jumping the Sheave
The right-side cable repeatedly derails when the boom is fully extended. This leads to fraying, flattening, and eventual breakage. Even after professional installation, the issue persists.
- Uneven Tension Between Cables
If one cable is tighter than the other, the boom may extend unevenly. This causes slack in the looser cable, increasing the chance of derailment.
- Wear Pad Misalignment
Boom wear pads guide the sections during extension. If they are worn or dislodged, the boom may tilt slightly, allowing one cable to lose tension and jump the sheave.
- Sheave Bushing Wear
Though not always visible, internal bushing wear in the sheave can cause wobble or misalignment. Grease access holes are often difficult to reach, leading to neglected lubrication.
- Inspect Cable Routing and Anchor Points
Confirm that cables are routed correctly and not crossed. Misrouting can cause uneven pull and premature failure.
- Measure Thread Protrusion for Tension Matching
Use the number of exposed threads on the cable nuts to match tension between left and right cables. This method, while simple, ensures relative consistency.
- Use a Torque Wrench with Extension Compensation
If using a torque wrench with extensions, add 1 ft-lb per inch of extension to maintain accuracy. This helps achieve balanced tension without specialized tools.
- Check Wear Pads and Sheave Bushings
Remove boom sections if necessary to inspect wear pads. Replace any that show signs of cracking or displacement. Grease sheave bushings thoroughly and check for play.
- Replace Cables as Matched Sets
Always replace both cables together to maintain symmetry. After installation, run the crane with test weights and recheck tension. Repeat inspection after several weeks of operation.
In Illinois, a mechanic working for a National dealer noted that sudden boom elevation or swing movements at full extension often dislodge wear pads, especially when bushings are dry. He recommended a full teardown and inspection rather than repeated cable replacement. His advice: “If the boom’s crooked, the cable’s doomed.”
Tooling and Calibration Notes
- No proprietary cable tensioning tool is required, but consistent torque application is critical.
- Some technicians fabricate long-reach torque extensions to access anchor nuts without removing boom sections.
- Calibration should be logged and rechecked periodically, especially after heavy lifting cycles.
Proportioning cable failures on National 1300 series cranes stem from a combination of mechanical wear, tension imbalance, and boom misalignment. Addressing the issue requires more than cable replacement—it demands a holistic inspection of wear pads, sheaves, and extension synchronization. With careful calibration and preventive maintenance, operators can restore reliable boom function and avoid costly downtime.