Long Front Excavators and Their Role in Specialized Earthmoving
#1
What Defines a Long Front Machine
Long front excavators are purpose-built machines equipped with extended boom and arm assemblies that allow for greater reach and digging depth compared to standard excavators. These machines are often referred to as long-reach or high-reach excavators depending on their configuration. While standard excavators typically offer reach in the range of 20 to 30 feet, long front variants can extend well beyond 60 feet, with some specialized models reaching over 100 feet.
Terminology notes:
  • Long-reach excavator: Designed for horizontal reach, often used in dredging, slope shaping, and canal work.
  • High-reach excavator: Configured for vertical reach, primarily used in demolition of multi-story structures.
In Ontario, a contractor used a long-reach Komatsu PC300 to clean sediment from a retention pond without disturbing the surrounding embankment. The extended boom allowed precise control from the bank, reducing environmental impact and eliminating the need for barges.
Applications That Require Extended Reach
Long front machines are not general-purpose excavators. Their design suits specific tasks where reach and control are more critical than breakout force or cycle speed.
Common applications include:
  • Dredging rivers, lakes, and harbors
  • Shaping embankments and levees
  • Excavating deep foundations or basements
  • Demolishing tall buildings from a safe distance
  • Cleaning sediment from wastewater lagoons
  • Handling hazardous materials in containment zones
In Tennessee, a grading crew used a long-reach CAT 330 to remove contaminated soil from a chemical spill site. The extended reach allowed them to stay outside the exclusion zone while maintaining full control of the bucket.
Mechanical Tradeoffs and Design Considerations
Long front excavators sacrifice some lifting capacity and breakout force due to the leverage created by the extended boom. To compensate, manufacturers reinforce the boom structure, add counterweights, and often limit the size of the bucket.
Design features include:
  • Reinforced boom and stick with internal stiffeners
  • Additional counterweight for balance and stability
  • Reduced bucket size to manage hydraulic load
  • Slower cycle times due to longer hydraulic travel
  • Optional GPS and laser guidance for precision grading
Suggested upgrades:
  • Install boom-mounted cameras for visibility
  • Use tilt buckets or grading beams for slope work
  • Add hydraulic quick couplers for attachment changes
  • Retrofit with long-range telematics for remote monitoring
In South Africa, a vineyard crew used a long-reach Hitachi ZX210 to shape irrigation canals. The machine’s reach allowed them to maintain consistent slope angles without repositioning, saving fuel and time.
Transport and Setup Challenges
Due to their size, long front machines often require partial disassembly for transport. The boom and stick may be removed and shipped separately, especially when crossing state or provincial lines.
Transport considerations:
  • Use lowboy trailers with extended deck length
  • Secure boom sections with padded restraints
  • Coordinate with pilot vehicles for oversized loads
  • Inspect hydraulic lines and pins after reassembly
  • Perform a full range-of-motion test before deployment
In New Zealand, a contractor transporting a long-reach Volvo EC480 across mountain roads used a modular trailer with hydraulic ramps. The boom was shipped on a separate flatbed and reassembled on-site with a crane.
Maintenance and Wear Patterns
Long front machines experience unique wear due to the extended leverage and vibration. Key areas to monitor include:
  • Boom pivot pins and bushings
  • Hydraulic cylinder seals and rod ends
  • Stick-to-bucket linkage
  • Counterweight mounts and frame welds
  • Undercarriage wear from uneven loading
Preventive maintenance tips:
  • Grease all pivot points daily during active use
  • Inspect welds and gussets for fatigue cracks monthly
  • Replace hydraulic hoses every 1,000 hours or as needed
  • Monitor oil temperature and pressure during extended cycles
  • Keep boom and stick clean to prevent abrasive buildup
Suggested spares to stock:
  • Boom and stick pin kits
  • Hydraulic cylinder seal kits
  • Bucket teeth and cutting edges
  • Counterweight mounting hardware
  • Hose clamps and protective sleeves
In Florida, a demolition crew added vibration dampers to their long-reach excavator’s boom. This reduced stress on the pivot pins and extended service intervals by 40%.
Operator Stories and Field Wisdom
In Alberta, a snow-clearing team used a long-reach machine to remove ice from a drainage canal. The extended boom allowed them to reach across the frozen surface without risking equipment on unstable ice.
In Poland, a contractor used a long-reach excavator to demolish a six-story concrete structure. The machine was equipped with a high-reach arm and a concrete pulverizer, allowing precise removal of floor slabs without disturbing adjacent buildings.
Conclusion
Long front excavators are specialized tools that extend the reach of traditional earthmoving. Whether shaping canals, dredging harbors, or demolishing towers, these machines offer precision and safety where standard equipment falls short. With proper setup, maintenance, and operator skill, long fronts transform complex jobs into controlled operations—reaching farther, working smarter, and reshaping the landscape one boom at a time.
Reply


Possibly Related Threads…
Thread Author Replies Views Last Post
  Allis-Chalmers HD-16 Bulldozer Remains a Classic in Earthmoving History MikePhua 0 1 7 minutes ago
Last Post: MikePhua
  Komatsu PC200 and PC120 Excavators Compared in Real-World Applications MikePhua 0 3 9 minutes ago
Last Post: MikePhua
  Case 480E LL and the Role of PTO Hydraulic Motors in Loader-Backhoe Systems MikePhua 0 1 21 minutes ago
Last Post: MikePhua
  Sumitomo Excavators and the Enduring Legacy of Japanese Engineering MikePhua 0 3 1 hour ago
Last Post: MikePhua
  Fuel Efficiency in Volvo EC360 Excavators MikePhua 0 4 1 hour ago
Last Post: MikePhua
  Drott Yumbo Excavators MikePhua 0 4 1 hour ago
Last Post: MikePhua
  Does Gehl Still Make Excavators? MikePhua 0 4 2 hours ago
Last Post: MikePhua
  Differences Between John Deere JD160 and JD160C Excavators MikePhua 0 4 2 hours ago
Last Post: MikePhua
  Comparing CAT 301.8C and 301.7D Mini Excavators in Real-World Use MikePhua 0 4 2 hours ago
Last Post: MikePhua
  Hitachi 120 Pattern Change in Excavators MikePhua 0 4 3 hours ago
Last Post: MikePhua
  Terex 3000 Site Dumper and Its Role in Compact Earthmoving MikePhua 0 11 Yesterday, 11:48 PM
Last Post: MikePhua
  The New Replacement Excavators from Caterpillar Are Smarter and More Precise MikePhua 0 4 Yesterday, 10:41 PM
Last Post: MikePhua
  Case Excavators Built by Link-Belt MikePhua 0 5 Yesterday, 04:06 PM
Last Post: MikePhua
  Tunnel Excavators and Their Role in Confined-Space Infrastructure MikePhua 0 4 Yesterday, 03:58 PM
Last Post: MikePhua
  Self-Loading Railcar Backhoes and Their Role in Trackside Maintenance MikePhua 0 4 Yesterday, 03:55 PM
Last Post: MikePhua

Forum Jump:


Users browsing this thread: 1 Guest(s)