Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Changing Control Pattern on Hitachi EX300 and Excavator Pilot Circuit Adaptations
#1
The EX300 and Hitachi’s Hydraulic Excavator Milestone
The Hitachi EX300 hydraulic excavator was introduced in the late 1980s as part of Hitachi’s push into the global heavy equipment market. Built with a focus on durability, hydraulic precision, and operator comfort, the EX300 quickly became a staple in earthmoving fleets across Asia, North America, and the Middle East. With an operating weight of approximately 30 metric tons and powered by a six-cylinder Isuzu diesel engine, the EX300 offered a balance of breakout force, reach, and fuel efficiency.
Hitachi, founded in 1910, had by the 1990s established itself as a leader in hydraulic control systems. The EX300 featured a pilot-operated joystick system, allowing smooth modulation of boom, arm, bucket, and swing functions. However, one challenge faced by operators and fleet managers was the variation in control patterns across regions—specifically the difference between ISO and SAE (also known as JD) patterns.
Understanding Control Patterns and Operator Preference
Excavator control patterns refer to the joystick movements that correspond to machine functions. The two dominant standards are:
  • ISO pattern:
    • Left joystick: swing (left/right), boom (up/down)
    • Right joystick: arm (in/out), bucket (curl/dump)
  • SAE or JD pattern:
  • Left joystick: swing (left/right), arm (in/out)
  • Right joystick: boom (up/down), bucket (curl/dump)
Key terminology:
  • Pilot control: A low-pressure hydraulic circuit that actuates valves controlling high-pressure flow to cylinders and motors.
  • Pattern change valve: A selector mechanism that reroutes pilot lines to switch control logic.
  • Joystick logic: The mapping of joystick movement to hydraulic function.
Operators trained in one pattern often struggle with the other, leading to inefficiency or safety risks. In North America, ISO is standard, while SAE remains common in older machines and agricultural applications.
Pattern Change Mechanism and Installation Procedure
The EX300 does not come standard with a pattern change valve, but it can be retrofitted. The process involves rerouting pilot lines between the joysticks and the main control valve. Some newer machines use an electric solenoid valve or manual selector knob, but the EX300 requires a mechanical valve block.
Installation steps:
  • Identify pilot lines from each joystick (typically four per side)
  • Label each line according to function: boom, arm, bucket, swing
  • Install a pattern change valve block between joystick and valve bank
  • Route lines through the valve according to desired pattern logic
  • Mount selector lever in cab for operator access
  • Test all functions with engine running and hydraulic pressure active
Recommendations:
  • Use high-quality hydraulic fittings rated for pilot pressure (usually 300–500 psi)
  • Avoid sharp bends or kinks in pilot hoses
  • Secure lines with clamps and grommets to prevent vibration wear
  • Label selector positions clearly to avoid confusion
  • Train operators on pattern change procedure and safety implications
One technician in Alberta installed a pattern change valve on a fleet of EX300s to accommodate mixed crews. The retrofit reduced operator error and improved productivity during trenching and loading operations.
Troubleshooting Pattern Change Issues
After installation, common issues include:
  • Delayed response due to air in pilot lines
  • Incorrect function mapping from misrouted hoses
  • Leaks at fittings or selector valve seals
  • Joystick stiffness from binding or contamination
Solutions:
  • Bleed pilot lines by cycling controls with engine off and key on
  • Verify hose routing against schematic before pressurizing
  • Replace O-rings and seals in selector valve if leaking
  • Clean joystick pivot points and lubricate bushings
  • Use a pressure gauge to confirm pilot signal strength
One operator in Georgia reported that his boom would not lift after switching patterns. The issue was traced to a reversed pilot line at the selector valve. After correcting the routing, the machine operated normally.
Operator Training and Fleet Standardization
Pattern change capability is especially valuable in mixed fleets or rental operations. Standardizing control patterns across machines reduces training time and improves safety.
Best practices:
  • Choose one pattern for all machines in a fleet
  • Label machines with pattern type near joystick base
  • Include pattern change instructions in operator manual
  • Conduct pattern familiarization during onboarding
  • Use simulator or low-pressure mode for training
One contractor in Texas standardized all excavators to ISO pattern and added selector valves to older units. This allowed seamless operator transitions and reduced incidents during tight excavation work.
Conclusion
Changing the control pattern on a Hitachi EX300 is a practical upgrade that enhances operator adaptability and fleet consistency. With a mechanical pilot system and accessible hydraulic layout, the EX300 lends itself well to pattern change retrofits. Whether digging foundations or loading trucks, the right control logic ensures precision, safety, and operator confidence. In the hands of a skilled crew, a well-configured EX300 becomes more than a machine—it becomes an extension of the operator’s intent.
We sell 3 types:
1. Brand-new excavators.
2. Refurbished excavators for rental business, in bulk.
3. Excavators sold by original owners
https://www.facebook.com/ExcavatorSalesman
https://www.youtube.com/@ExcavatorSalesman
Whatsapp/Line: +66989793448 Wechat: waji8243
Reply


Possibly Related Threads…
Thread Author Replies Views Last Post
  Evaluating the John Deere 50 Midi Excavator Legacy and Practical Ownership MikePhua 0 1 17 minutes ago
Last Post: MikePhua
  What Is the Largest Excavator That Can Run a 12-Inch Bucket MikePhua 0 1 18 minutes ago
Last Post: MikePhua
  Christy Carriage in Logging Operations Mechanical Realities and Field Adaptations MikePhua 0 1 22 minutes ago
Last Post: MikePhua
  Komatsu PC210 Excavator Overview and Common Questions MikePhua 0 4 1 hour ago
Last Post: MikePhua
  Komatsu PC128UU-1 Excavator Overview MikePhua 0 4 1 hour ago
Last Post: MikePhua
  Tier 4 Emissions and the Changing Landscape of Diesel Equipment MikePhua 0 4 2 hours ago
Last Post: MikePhua
  John Deere 690E LC Excavator Performance and Maintenance Realities MikePhua 0 4 2 hours ago
Last Post: MikePhua
  Kobelco SK210LC-8 Excavator Service Manual Insights MikePhua 0 4 3 hours ago
Last Post: MikePhua
  Fiat-Hitachi FD-255 Dozer and Its Rare Legacy MikePhua 0 4 3 hours ago
Last Post: MikePhua
  Experience with the CAT 315: A Practical Review of the Excavator's Performance MikePhua 0 4 3 hours ago
Last Post: MikePhua
  Hitachi EX200-1 vs EX200-2 Excavators in Field Performance and System Evolution MikePhua 0 4 3 hours ago
Last Post: MikePhua
  Choosing the Right Excavator for Your Needs MikePhua 0 4 3 hours ago
Last Post: MikePhua
  KomStat vs KomStat II in Komatsu Dozers and the Evolution of Control Systems MikePhua 0 4 3 hours ago
Last Post: MikePhua
  Review of the New Hitachi Wheel Loaders MikePhua 0 4 4 hours ago
Last Post: MikePhua
  The Hitachi EX200: A Robust Excavator for Versatile Applications MikePhua 0 4 4 hours ago
Last Post: MikePhua

Forum Jump:


Users browsing this thread: 1 Guest(s)