Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Assembly of DR460 O/B Drill
#1
The DR460 O/B drill is a crucial piece of equipment in the mining and construction industries. Manufactured by Atlas Copco, this rotary blast hole drill is designed for drilling large diameter holes in hard rock formations. It is widely used in applications like quarrying, mining, and civil construction, where precision and durability are key. The assembly process of this machine is intricate and requires a methodical approach to ensure its components function together smoothly. This guide will provide detailed insights into the assembly of the DR460 O/B drill, including the critical steps involved, necessary tools, and troubleshooting advice for common issues that might arise during the assembly process.
Overview of the DR460 O/B Drill
The DR460 O/B is part of Atlas Copco's larger fleet of surface drill rigs, specifically designed for high-production drilling in open-pit mining and construction applications. It features advanced technological systems for optimizing drilling efficiency, reducing fuel consumption, and improving operator safety. With a powerful engine and a robust design, it is built to handle the tough environments often encountered in large-scale drilling operations. The drill is equipped with sophisticated control systems, including GPS for accurate positioning and remote control for ease of operation.
Components of the DR460 O/B Drill
Before diving into the assembly process, it’s crucial to understand the key components of the DR460 O/B drill. Each part plays an essential role in the drill’s overall performance, and proper installation is critical for ensuring long-term functionality. Here’s a brief look at the key components:
  1. Rotary Head: This is the heart of the drill. It provides the rotational force needed to drill into the rock. The rotary head is powered by hydraulics and typically has a high torque capacity to handle tough drilling conditions.
  2. Drill Mast: The mast holds the rotary head and ensures that the drill is positioned correctly during the drilling process. It is adjustable to accommodate various hole depths.
  3. Feed System: The feed system is responsible for pushing the drill bit into the rock as it rotates. It is typically powered by hydraulic cylinders.
  4. Control System: The control system allows the operator to manage drilling operations, including speed, pressure, and direction. Modern systems are often computerized and feature remote monitoring.
  5. Track System: The drill is mounted on tracks for mobility. The track system allows the machine to move easily across a variety of terrains.
  6. Power System: The DR460 O/B is typically powered by a diesel engine that provides the necessary energy for the drill’s operations.
  7. Dust Collection System: This system is designed to reduce dust generated during drilling, which is a significant concern in mining operations. It includes a vacuum system and filters to capture dust and debris.
  8. Boom and Feed Cylinder: These components are responsible for adjusting the drill height and angle to ensure that the drill bit stays on track.
Step-by-Step Guide to Assembling the DR460 O/B Drill
Assembling the DR460 O/B drill is a meticulous process that involves several key steps. Below is a general overview of the assembly process:
Step 1: Positioning and Initial Setup
Before you begin the assembly, ensure that the work area is clean and that all tools and components are within reach. It is advisable to use a flat, stable surface for the assembly. Begin by positioning the major components, such as the track system, rotary head, and drill mast, in close proximity.
Step 2: Assembling the Track System
  1. Attach the Track Chains: Start by attaching the track chains to the track frame. Ensure that the tracks are correctly aligned, and secure them using the appropriate fasteners.
  2. Hydraulic Systems: Connect the hydraulic lines to the track drive system. These lines provide power to the track system, allowing it to move the drill across the job site.
  3. Verify Movement: Once the track system is installed, test its functionality by moving the drill back and forth. Ensure that the track is running smoothly and that there are no obstructions.
Step 3: Mounting the Rotary Head and Mast
  1. Position the Mast: Secure the drill mast to the base of the machine. The mast should be aligned with the frame, and its mounting bolts should be tightened to the manufacturer’s specifications.
  2. Install the Rotary Head: Attach the rotary head to the mast. This step usually requires lifting equipment due to the weight and size of the rotary head.
  3. Hydraulic Connections: Connect the hydraulic hoses to the rotary head. These hoses control the movement and torque of the rotary head, so proper installation is crucial.
Step 4: Installing the Feed System
The feed system involves the installation of the feed cylinders, which push the drill bit into the rock.
  1. Attach Feed Cylinders: Connect the feed cylinders to both the drill mast and the feed mechanism. These cylinders are typically powered by hydraulics, so ensure that they are securely connected to the hydraulic system.
  2. Test Feed Movement: Once the feed system is attached, perform a test to ensure that the system operates smoothly. The feed system should move the drill bit steadily into the rock without any jerky movements or interruptions.
Step 5: Setting Up the Control and Dust Collection Systems
  1. Control System Wiring: The control system for the DR460 O/B drill is typically computerized and may include GPS functionality. Connect all necessary wiring and ensure that the control panel is properly installed inside the operator’s cabin.
  2. Dust Collection System: Attach the dust collection system to the drill head. This system should be connected to a vacuum source and fitted with the necessary filters to minimize dust exposure.
Step 6: Powering Up the System
  1. Install the Power Unit: The drill is powered by a diesel engine. Ensure that the engine is installed correctly and that all fuel lines, exhaust systems, and electrical components are connected.
  2. Hydraulic Fluid Check: Before starting the drill, check the hydraulic fluid levels. Ensure that all hydraulic connections are tight and free from leaks.
Step 7: Final Testing and Calibration
  1. Test All Systems: Once the drill is assembled, conduct a comprehensive test of all systems. Check the track system, rotary head, feed system, and control system for proper operation.
  2. Calibrate the Drill: Perform a calibration of the drill’s systems. This includes setting up the correct drilling parameters, such as pressure and speed.
Troubleshooting Common Assembly Issues
Despite following the assembly instructions carefully, issues may arise during the process. Some common problems include:
  1. Hydraulic Leaks: Leaks in the hydraulic system can cause loss of pressure, leading to poor performance. Always double-check hydraulic connections and seals to prevent leaks.
  2. Misalignment of Parts: If parts are not aligned correctly, they may cause the machine to malfunction. Use alignment tools to ensure all components are positioned accurately.
  3. Electrical Malfunctions: Faulty wiring or incorrect connections can result in a non-functional control system. Always use the proper wiring diagram and ensure that all connections are secure.
  4. Track Issues: If the track system is not functioning correctly, it could be due to loose chains or improper alignment. Inspect the tracks regularly and tighten them as needed.
Maintenance Tips for the DR460 O/B Drill
To keep your DR460 O/B drill operating efficiently, regular maintenance is essential. Here are a few tips for maintaining the drill:
  1. Hydraulic System Maintenance: Regularly check the hydraulic system for leaks and ensure that the fluid levels are topped up.
  2. Track Inspections: Inspect the tracks periodically for wear and tear. Replace worn-out parts before they cause further damage.
  3. Engine Servicing: Schedule routine servicing for the engine, including oil changes and air filter replacements.
  4. Dust Collection System: Clean the dust collection system regularly to ensure it is functioning properly.
Conclusion
The assembly of the DR460 O/B drill is a critical process that requires careful attention to detail. By understanding each component and following the assembly steps thoroughly, operators can ensure that the drill performs at its best. Regular maintenance and troubleshooting also play a significant role in the longevity and efficiency of the machine. With the right approach, the DR460 O/B drill can continue to serve as a valuable tool for large-scale drilling operations, offering precision and reliability in tough working environments.
We sell 3 types:
1. Brand-new excavators.
2. Refurbished excavators for rental business, in bulk.
3. Excavators sold by original owners
https://www.facebook.com/ExcavatorSalesman
https://www.youtube.com/@ExcavatorSalesman
Whatsapp/Line: +66989793448 Wechat: waji8243
Reply


Possibly Related Threads…
Thread Author Replies Views Last Post
  International Harvester 175B Final Drive Assembly MikePhua 0 1 11 minutes ago
Last Post: MikePhua
  Komatsu PC200LC Valve Assembly 723-47-29100 MikePhua 0 2 Yesterday, 02:39 PM
Last Post: MikePhua
  Identifying an Unknown Drill: A Guide to Drilling Equipment MikePhua 0 7 09-10-2025, 02:53 PM
Last Post: MikePhua
  Caterpillar D6C Front Idler Assembly: A Key Component in Track System Maintenance MikePhua 0 30 08-30-2025, 10:10 PM
Last Post: MikePhua
  Reviving Rusty Drill Bits: Restoration and Maintenance Techniques MikePhua 0 38 08-28-2025, 02:12 AM
Last Post: MikePhua
  Ditch Witch JT922 Remains a Reliable Horizontal Drill for Utility Contractors MikePhua 0 43 08-24-2025, 09:38 PM
Last Post: MikePhua
  Takeuchi TB070 Hydraulic Valve Assembly on Top of Hydraulic Filter MikePhua 0 40 08-20-2025, 08:34 PM
Last Post: MikePhua
  The 320/40066 JCB Backhoe Engine Assembly MikePhua 0 42 08-17-2025, 04:06 PM
Last Post: MikePhua
  Understanding and Repairing the Differential Lock Housing Assembly on the Case 580C MikePhua 0 46 08-08-2025, 11:28 PM
Last Post: MikePhua
  Komatsu PC75UU-2 Hydraulic Pump Assembly Replacement: A Comprehensive Guide MikePhua 0 72 07-31-2025, 01:43 PM
Last Post: MikePhua
  Pump Assembly Lubrication: Essential Practices for Longevity and Efficiency MikePhua 0 79 07-23-2025, 10:54 AM
Last Post: MikePhua
  Troubleshooting and Repairing the Parking Brake Assembly on a Case 580E Loader MikePhua 0 83 07-22-2025, 11:38 PM
Last Post: MikePhua
  Upgrading Your Heavy Equipment Seat: A Guide to Seat Assembly and Comfort MikePhua 0 85 07-22-2025, 03:11 PM
Last Post: MikePhua
  The Ultimate Guide to Drill Bits MikePhua 0 95 07-15-2025, 01:31 PM
Last Post: MikePhua
  YUCHAI YC6105 YC6J180 YC6J220 Diesel Engine $680.00 Assembly 6 Cylinder MikePhua 0 372 01-17-2025, 11:54 PM
Last Post: MikePhua

Forum Jump:


Users browsing this thread: 1 Guest(s)