Installing a Sewer Pump Station with a Sumitomo Excavator
#1
The Scope and Depth of the Excavation
In South Australia, a new sewer pump station project required a deep excavation measuring approximately 4.5 meters in depth and 4 meters in both width and length. This type of confined excavation demands precise control, stable trench walls, and careful coordination between operators and ground crews. The depth alone places the dig into the category of “high-risk trenching,” where soil collapse and water ingress become serious concerns. According to Australian safety guidelines, any trench deeper than 1.5 meters must be assessed for shoring or benching, and this project exceeded that threshold by a wide margin.
The excavation was executed using a 13-ton Sumitomo hydraulic excavator, a machine known for its smooth controls and responsive hydraulics. Sumitomo, a Japanese manufacturer with roots dating back to the 17th century, entered the construction equipment market in the 1960s. Their excavators are widely used in Asia and Oceania, with the 13-ton class being popular for urban utility work due to its balance of power and maneuverability.
Terminology Clarification
  • Sewer Pump Station: A facility that moves wastewater from lower to higher elevation using pumps, often necessary in flat or low-lying areas.
  • Trench Box: A steel or aluminum structure used to protect workers from cave-ins during deep excavations.
  • Hydraulic Excavator: A machine that uses pressurized fluid to power its boom, arm, and bucket movements.
  • Spoil Pile: Excavated material temporarily stored near the trench, which must be kept at least 1 meter from the edge to prevent collapse.
Performance of the Sumitomo Excavator
The operator noted that it was their first time using a Sumitomo, and the experience was notably positive. The machine delivered ample digging power and operated with impressive smoothness, especially when trenching through compacted clay and mixed fill. These conditions are common in urban infrastructure projects, where previous construction layers and natural soil interact unpredictably.
Sumitomo’s 13-ton model typically features:
  • Engine output around 100–110 horsepower
  • Digging depth capability exceeding 5.5 meters
  • Advanced hydraulic flow control for precise bucket movements
  • Reinforced boom and arm for heavy-duty trenching
In comparative field tests, Sumitomo excavators have shown fuel efficiency advantages over some competitors in the same weight class, particularly in idle-to-load transitions. This makes them ideal for utility work where frequent repositioning and short bursts of digging are common.
Challenges and Site Conditions
Digging a 4.5-meter-deep hole in an urban or semi-urban environment presents multiple challenges:
  • Groundwater seepage, which can destabilize trench walls
  • Limited access for spoil removal and pump station installation
  • Safety compliance for confined space entry and trench support
In this case, the excavation was completed without incident, and the pump station was successfully installed. The final site photo showed a clean finish, with the station integrated into the surrounding infrastructure. Proper grading and backfill were evident, suggesting attention to long-term settlement and surface runoff control.
Operator Insights and Field Anecdotes
One operator from Victoria recalled a similar dig for a stormwater detention tank. Their machine struggled with clay lenses that dulled the bucket teeth within hours. Switching to a rock bucket with reinforced edges solved the issue. In contrast, the Sumitomo used in this project maintained cutting efficiency throughout, likely due to newer teeth and optimized hydraulic pressure.
Another technician in Queensland emphasized the importance of pre-dig soil testing. On one job, unexpected fill material included concrete rubble and rebar, which halted progress until a hammer attachment was brought in. This underscores the value of geotechnical surveys before any deep excavation.
Recommendations for Similar Projects
  • Conduct soil classification and groundwater assessment before digging
  • Use trench boxes or shoring systems for any excavation deeper than 1.5 meters
  • Choose excavators with responsive hydraulics and reinforced booms for deep trenching
  • Maintain a safe spoil pile distance and monitor trench edges for signs of collapse
  • Train operators on confined space protocols and emergency extraction procedures
Conclusion
The successful installation of a sewer pump station using a 13-ton Sumitomo excavator highlights the importance of equipment selection, operator skill, and site preparation. With smooth hydraulic performance and sufficient digging power, the machine proved ideal for the task. As urban infrastructure continues to expand, projects like this demonstrate how modern excavators and thoughtful planning can deliver efficient, safe, and lasting results. Whether in South Australia or elsewhere, the lessons from this dig apply broadly to utility contractors and municipal engineers tackling similar challenges.
Reply


Possibly Related Threads…
Thread Author Replies Views Last Post
  Excavator Backfill Conveyor Systems MikePhua 0 21 01-04-2026, 06:21 PM
Last Post: MikePhua
  Largest Excavator You Pull With a Pickup Truck MikePhua 0 35 12-30-2025, 08:34 PM
Last Post: MikePhua
  Cleaning Bio from Pump on Case 1845C MikePhua 0 37 12-30-2025, 08:32 PM
Last Post: MikePhua
  Returning to Heavy Equipment and Buying a Small Excavator MikePhua 0 37 12-30-2025, 08:19 PM
Last Post: MikePhua
  Bucket Rebuild for 318B Excavator MikePhua 0 48 12-29-2025, 03:19 PM
Last Post: MikePhua
  Sumitomo SH120‑3 Shop Manual MikePhua 0 38 12-29-2025, 03:08 PM
Last Post: MikePhua
  Installing Injectors in a Caterpillar 3304 PC Engine MikePhua 0 38 12-25-2025, 08:37 AM
Last Post: MikePhua
  Hitachi ZX350H-3 Excavator Bucket Cylinder Torque and Hydraulic Considerations MikePhua 0 42 12-25-2025, 08:30 AM
Last Post: MikePhua
  Mini Excavator Snow and Ice Traction MikePhua 0 55 12-20-2025, 07:45 PM
Last Post: MikePhua
  Excavator Komatsu PC200LC control pattern valve location MikePhua 0 69 12-17-2025, 03:49 PM
Last Post: MikePhua
  Sumitomo S160-2 manual and machine legacy MikePhua 0 58 12-17-2025, 03:05 PM
Last Post: MikePhua
  Kato Excavator Seeking Help MikePhua 0 90 12-09-2025, 03:54 PM
Last Post: MikePhua
  Tilting Excavator Innovation MikePhua 0 106 12-02-2025, 02:44 PM
Last Post: MikePhua
  Dipstick On Pump Probably A Stupid Question MikePhua 0 90 12-02-2025, 02:33 PM
Last Post: MikePhua
  Choosing the Right Excavator Size Depends on Hauling Limits, Job Scope, and Terrain MikePhua 0 125 11-19-2025, 03:40 PM
Last Post: MikePhua

Forum Jump:


Users browsing this thread: 1 Guest(s)