Overview of the EC140B and Auxiliary Hydraulics
The Volvo EC140B is a mid-sized excavator, well-suited for general excavation, trenching, and light demolition tasks. One of its standout features is its compatibility with various hydraulic attachments, including hammers (also known as breakers), grapples, and compactors. For these attachments to function, auxiliary hydraulic circuits—commonly referred to as hammer pipework or breaker lines—must be installed and properly configured.
Hammer pipework enables high-flow, high-pressure hydraulic oil to be routed from the main control valve to the front of the excavator’s arm, allowing hydraulic attachments to be powered safely and efficiently. While the EC140B often came “hammer-ready” from the factory, retrofitting or diagnosing these systems presents unique challenges.
Components of a Hammer Circuit
A typical hammer pipework system includes the following:
Despite Volvo’s generally intuitive design, operators and mechanics often encounter confusion when working with the EC140B’s auxiliary lines. Common issues include:
Hydraulic System Basics (Glossary)
The EC140B’s auxiliary circuit is often controlled via a switch in the cab, sending an electrical signal to a solenoid on the main valve block. Problems here can often be traced to:
Tuning Flow for Hammer Operation
Correct hydraulic flow is critical for hammer life and performance. Too little flow causes weak strikes; too much causes overheating. Ideally, the flow should be adjusted with a flow control valve to match the specifications of the hammer being used. If the EC140B does not have one installed inline, an aftermarket unit can be added near the quick couplers.
One contractor shared a story of using a small Montabert hammer on their EC140B. Without adjusting flow, the hammer over-sped and shattered its piston after an hour of work. A simple adjustable flow valve could have prevented the damage.
Factory vs Aftermarket Pipework Kits
Volvo’s factory auxiliary kits are well-engineered and include mounting brackets, correct-length hoses, pilot controls, and wiring harnesses. Aftermarket kits, while more affordable, often require:
Hammering in the Real World: Lessons from Job Sites
Hydraulic hammers are demanding attachments. When used with excavators like the EC140B, operators must pay attention to:
Conclusion: The Right Setup Equals Long-Term Value
The Volvo EC140B, when properly configured with reliable hammer pipework, becomes a versatile workhorse capable of handling tough attachments with ease. Yet success lies in understanding both the hydraulic and electrical subtleties of the system. Whether you’re installing a new kit, diagnosing an issue, or just trying to get the most out of your machine, taking the time to ensure correct flow, return paths, and switch function will pay dividends in uptime and tool longevity.
As with many mechanical systems, it’s not just about having the right parts—it’s about putting them together with knowledge, care, and attention to detail.
The Volvo EC140B is a mid-sized excavator, well-suited for general excavation, trenching, and light demolition tasks. One of its standout features is its compatibility with various hydraulic attachments, including hammers (also known as breakers), grapples, and compactors. For these attachments to function, auxiliary hydraulic circuits—commonly referred to as hammer pipework or breaker lines—must be installed and properly configured.
Hammer pipework enables high-flow, high-pressure hydraulic oil to be routed from the main control valve to the front of the excavator’s arm, allowing hydraulic attachments to be powered safely and efficiently. While the EC140B often came “hammer-ready” from the factory, retrofitting or diagnosing these systems presents unique challenges.
Components of a Hammer Circuit
A typical hammer pipework system includes the following:
- Main feed and return lines: These deliver high-pressure hydraulic oil to and from the attachment.
- Control valve or spool: Often located in the main valve block, this determines flow activation.
- Pilot-operated on/off switch: Usually located in the cab to start or stop flow to the attachment.
- Flow control valve: Allows adjustment of flow rate for compatibility with different tools.
- Case drain line (optional): Some hydraulic hammers require a third, low-pressure return line for internal leakage. Not all EC140B setups include this.
- Quick couplers: Allow fast connection and disconnection of attachments, often flat-face or push-to-connect styles.
Despite Volvo’s generally intuitive design, operators and mechanics often encounter confusion when working with the EC140B’s auxiliary lines. Common issues include:
- Inverted lines: Feed and return lines swapped, causing backpressure and overheating.
- Non-functional control switch: Typically due to a faulty relay, broken wire, or lack of electric signal to the solenoid valve.
- Dead-headed return: Return line routed to a port with too much restriction, causing hammer seals to blow or performance to drop.
- Flow mismatch: The hammer attachment requires more flow than the auxiliary circuit can provide—or vice versa—resulting in erratic or weak operation.
Hydraulic System Basics (Glossary)
- Flow rate: The volume of hydraulic oil delivered per minute, measured in liters per minute (L/min) or gallons per minute (GPM). Determines how fast a hydraulic tool operates.
- Pressure: Force of hydraulic oil in the system, measured in bar or psi. Determines how hard a tool hits.
- Case drain: A low-pressure return path for leakage oil, often required for hammers with high-speed internal components.
- Spool valve: A sliding valve inside the control block that routes oil to the desired circuit.
- Pilot circuit: A low-pressure control system used to activate the high-pressure circuits.
The EC140B’s auxiliary circuit is often controlled via a switch in the cab, sending an electrical signal to a solenoid on the main valve block. Problems here can often be traced to:
- A blown fuse or relay
- Loose connector
- Failed solenoid coil
- Worn cab switch
Tuning Flow for Hammer Operation
Correct hydraulic flow is critical for hammer life and performance. Too little flow causes weak strikes; too much causes overheating. Ideally, the flow should be adjusted with a flow control valve to match the specifications of the hammer being used. If the EC140B does not have one installed inline, an aftermarket unit can be added near the quick couplers.
One contractor shared a story of using a small Montabert hammer on their EC140B. Without adjusting flow, the hammer over-sped and shattered its piston after an hour of work. A simple adjustable flow valve could have prevented the damage.
Factory vs Aftermarket Pipework Kits
Volvo’s factory auxiliary kits are well-engineered and include mounting brackets, correct-length hoses, pilot controls, and wiring harnesses. Aftermarket kits, while more affordable, often require:
- Custom welding for brackets
- Line trimming or extension
- Rewiring solenoids
- Valve reconfiguration
Hammering in the Real World: Lessons from Job Sites
Hydraulic hammers are demanding attachments. When used with excavators like the EC140B, operators must pay attention to:
- Duty cycles: Avoid continuous hammering for more than 15–20 seconds without repositioning, to prevent overheating.
- Greasing: Daily lubrication of the tool bushings with high-temp grease prevents premature wear.
- Proper angle: Hammering at an angle stresses the chisel and tool holder, risking fracture.
Conclusion: The Right Setup Equals Long-Term Value
The Volvo EC140B, when properly configured with reliable hammer pipework, becomes a versatile workhorse capable of handling tough attachments with ease. Yet success lies in understanding both the hydraulic and electrical subtleties of the system. Whether you’re installing a new kit, diagnosing an issue, or just trying to get the most out of your machine, taking the time to ensure correct flow, return paths, and switch function will pay dividends in uptime and tool longevity.
As with many mechanical systems, it’s not just about having the right parts—it’s about putting them together with knowledge, care, and attention to detail.