Grove GMK5175 LMI System Faults and Boom Calibration Challenges
#1
The GMK5175 and Grove’s Engineering Legacy
Grove, a division of Manitowoc, has been a leading manufacturer of mobile hydraulic cranes since the 1940s. The GMK5175, introduced in the mid-1990s, was part of Grove’s all-terrain crane lineup designed for high-capacity lifting with road mobility. With a five-axle carrier and a 175-ton rated lifting capacity, the GMK5175 became a popular choice for infrastructure projects, refinery work, and heavy industrial lifting.
The crane features a multi-section telescopic boom, advanced hydraulic controls, and an EKS3 Load Moment Indicator (LMI) system. The LMI is critical for safe operation, continuously monitoring boom extension, angle, load weight, and radius to prevent overloads and structural failure.
Symptoms of LMI Malfunction and Boom Readout Errors
Operators have reported erratic behavior in the LMI system, particularly during boom extension. Common symptoms include:
  • Section 1 extension not registering on the LMI, while section 2 readout increases incorrectly
  • Sections 3 and 4 showing reverse or negative values during unrelated boom movements
  • Inaccurate percentage readings that never reach full extension even when fully deployed
  • Load and radius indicators only displaying correct values in specific boom configurations
  • Sections 3 and 4 becoming stuck at full extension unless sections 1 and 2 are also fully extended
These issues suggest a breakdown in the calibration logic or sensor feedback loop. The EKS3 system relies on potentiometers mounted on each boom section spool to measure extension. If these sensors are misaligned, degraded, or cross-wired, the system may misinterpret boom positions and calculate incorrect load data.
Troubleshooting and Calibration Procedures
To resolve LMI faults, technicians typically follow a structured diagnostic process:
  • Sensor Replacement and Recalibration
    • Replace potentiometers on each boom section spool
    • Calibrate sensors at 0%, 50%, and 100% extension using Grove’s service software
    • Verify linear response across full stroke range
  • Electrical Checks
    • Inspect fuses and power supply to the LMI and data transmitters
    • Test wiring continuity and shield integrity to prevent signal interference
    • Check grounding points and eliminate voltage drops
  • Mechanical Verification
  • Confirm boom sections are physically extending as commanded
  • Inspect hydraulic spool valves for sticking or delayed response
  • Ensure boom section movement is not mechanically influencing adjacent sections
In one documented case, sections 3 and 4 showed negative values during section 1 extension due to a reversed polarity on the potentiometer wiring. Correcting the wiring restored accurate readings and eliminated the cascading errors.
Understanding LMI Logic and Load Calculation Dependencies
The EKS3 system calculates load moment based on boom angle, extension, and load cell feedback. If any input is incorrect, the system may miscalculate the safe working load or radius. For example:
  • When section 2 is at 100% and others are retracted, the system can accurately calculate the derricking cylinder pressure and boom moment
  • If sections 3 and 4 are extended without proper calibration, the system may misinterpret the boom geometry and underestimate the load radius
  • Inaccurate boom extension data can cause the LMI to restrict movement or display false overload warnings
Operators have noted that the system behaves predictably only in specific configurations, such as 0-1-0-0 or 0-5-0-0, where the boom extension matches the expected load profile. Any deviation from these calibrated states introduces errors.
Terminology Notes
  • LMI (Load Moment Indicator): A safety system that monitors crane load, boom angle, and extension to prevent overload.
  • Potentiometer: A variable resistor used to measure position or movement, critical for boom extension feedback.
  • Boom Section: Telescoping segments of the crane’s main lifting arm, each independently controlled.
  • Derricking Cylinder: Hydraulic actuator that adjusts boom angle, affecting load radius and moment.
  • EKS3: Grove’s proprietary electronic LMI system used in GMK-series cranes.
Field Strategies and Preventive Measures
To maintain LMI accuracy and prevent future faults:
  • Perform full boom calibration quarterly or after any sensor replacement
  • Avoid extending sections 3 and 4 to 100% unless necessary, as this often triggers recalibration needs
  • Document boom configurations during maintenance to assist in troubleshooting
  • Use Grove diagnostic software to monitor sensor values in real time
  • Train operators to recognize LMI inconsistencies and report them promptly
In one refinery project in Louisiana, a GMK5175 experienced repeated LMI faults during pipe lifting. After recalibrating all boom sections and replacing two potentiometers, the crane operated without error for the remainder of the job.
Final Thoughts
The Grove GMK5175 remains a powerful and capable crane, but its LMI system demands precision and vigilance. Accurate boom feedback is essential not only for safety but for operational efficiency. With proper calibration, electrical integrity, and mechanical alignment, the EKS3 system can deliver reliable performance. In the world of heavy lifting, data integrity is just as critical as hydraulic force. When the numbers are right, the lift is safe.
Reply


Messages In This Thread
Grove GMK5175 LMI System Faults and Boom Calibration Challenges - by MikePhua - 3 hours ago

Possibly Related Threads…
Thread Author Replies Views Last Post
  Caterpillar 289D Hard Start Diagnosis and Fuel System Recovery MikePhua 0 1 2 hours ago
Last Post: MikePhua
  CAT E70B Hydraulic Troubleshooting and System Recovery MikePhua 0 1 2 hours ago
Last Post: MikePhua
  John Deere 120C Timing Advance System and Diagnostic Insights MikePhua 0 1 2 hours ago
Last Post: MikePhua
  Troubleshooting the Shuttle Shift System on the Case 555E Loader MikePhua 0 1 3 hours ago
Last Post: MikePhua
  Hydraulic Troubleshooting and System Behavior on the John Deere 35G MikePhua 0 1 3 hours ago
Last Post: MikePhua
  Case W24C Wheel Loader Brake System: Common Issues and Maintenance Solutions MikePhua 0 1 3 hours ago
Last Post: MikePhua
  John Deere 310A Hydraulic System Troubles and Field Solutions MikePhua 0 3 3 hours ago
Last Post: MikePhua
  Caterpillar D6C Fan Belt Twisting and Pulley Alignment Challenges MikePhua 0 3 3 hours ago
Last Post: MikePhua
  Komatsu PW130-6 Boom Lift Failure and Hydraulic Troubleshooting MikePhua 0 1 3 hours ago
Last Post: MikePhua
  Caterpillar 320E Wiring Faults and Lift Pump Circuit Diagnosis MikePhua 0 1 3 hours ago
Last Post: MikePhua
  TD15C Starter Replacement and System Overview MikePhua 0 3 4 hours ago
Last Post: MikePhua
  CAT 416C Auto-Level System Diagnosis and Repair MikePhua 0 3 4 hours ago
Last Post: MikePhua
  Electrical System Restoration on the JCB 1550B Backhoe Loader MikePhua 0 1 4 hours ago
Last Post: MikePhua
  Resolving Boom Swing Malfunctions on the CAT 304CR Mini Excavator MikePhua 0 1 4 hours ago
Last Post: MikePhua
  Case 580 Super M Hydraulic Pump Failure and System Diagnosis MikePhua 0 1 5 hours ago
Last Post: MikePhua

Forum Jump:


Users browsing this thread: 1 Guest(s)